NGPP production site includes:

• warehouse complex of three elevators with a one-time storage capacity of 245,000 tons
• transshipment complex consisting of grain acceptance devices, allowing for the unloading up to 250 wagons and 600 road trains per day
• export gallery for grain shipment with a total length of 1.6 km and a total capacity of 4 conveyors mounted in it of 2,000 tons per hour

• complex of mooring equipment, consisting of two ship loading machines with a total capacity of 2,000 tons per hour
• developed internal transport infrastructure

Grain transshipment capacity
7.1mtpa
Motor vehicle grain receiver capacity
1,500tph
Railway vehicle grain receiver capacity
3,400tph
One-time storage capacity
245,000tons

Sell grain

Price list for current prices of grain procurement Demetra Trading in port and line elevators, the ability to calculate delivery to them from your warehouse.
Submit a request to Demetra Trading

Contacts

Address

22 Elevatornaya St., Novorossiysk, Krasnodar Krai, 353909